English
English 中文
News Center
Home > News
How to Properly Maintain TSB Grease Decolorization Chemical Pumps?
2024-08-13 16:50:13
Read:
Share:
1. Once the machine is installed, a test run ought to be conducted. Typically, it requires two hours of empty running and two oil changes because the TSB chemical decolorization pump will retain some volatile materials after cleaning. It can be returned to normal operation after that.
2. To empty the medium after operating the TSB chemical centrifugal pump in the chilly winter months, unscrew the drain plug located at the bottom of the pump body. In order to avoid freezing and cracking, take this action.
3. Open the outlet pressure gauge while the chemical centrifugal pump from the T series is operating normally. Check the motor load and gradually open the gate valve if the pump indicates the proper pressure. The bearing temperature cannot be higher than 35 degrees above the surrounding air temperature during T's operation, and it cannot be lower than 80 degrees. To attain maximum energy savings, aim to regulate the flow and head of the TSB series chemical centrifugal pump within the specified range on the label. This will enable the pump to function at a higher efficiency level. Close the gate valve and pressure gauge before turning off the motor to stop this machine.
4. Regularly check the sleeve's wear. It should be replaced as soon as possible if the wear is severe. A lengthy period of inactivity necessitates the complete disassembly of the T series chemical centrifugal pump, the removal of any standing water, the installation and lubrication of all rotating components and joints, and appropriate storage.
5. Verify if the TSB series grease pump's joints and pipes are loose. Typically, you can manually rotate it to determine the machine's flexibility.
6. Under normal conditions, the TSB series grease centrifugal pump should be overhauled after 2000 hours of operation, during which the age of the seal should be checked, the exhaust valve plate should be checked for cracks, and any debris that has accumulated on the valve plate and exhaust valve seat should be cleaned. The complete TSB series decolorization pump cavity, including the rotor, vane, spring, and other components, must also be cleaned. Use a dry cloth to wipe the rubber parts dry after cleaning them. Take extra precautions to avoid injury during assembly and cleaning.
7. The oil quality needs to be checked regularly. If the oil quality is found to be deteriorated, new oil should be replaced as soon as possible to ensure that the machine operates normally.
8. Please check the oil level position regularly. It has to be changed to comply with the standards if it doesn't already. When the TSB chemical centrifugal pump is operating, the oil level has to be in the middle of the oil mark.
9. The user determines the oil change interval based on real use conditions and the ability to meet performance criteria. It is generally advised to replace the oil in the TSB grease decolorization pump after 100 hours of use when it extracts clean, dry gas. An appropriate extension of the oil change interval can be made once ferrous metal powder is no longer visible in the oil.
Home
Products
Inquiry
WhatsApp